BLUE Residence

A new seaside residence

→ 44 apartments
→ 7,904 m² of living space
→ 80 underground parking spaces and 35 spaces on the ground floor
→ Completion date: March 31, 2027

BLUE Residence

A new seaside residence

→ 44 apartments
→ 7,904 m² of living space
→ 80 underground parking spaces and 35 spaces on the ground floor
→ Completion date: March 31, 2027

BLUE Benefits

BLUE Benefits

Air-conditioned bedrooms and living rooms

The bedrooms and living rooms are equipped with the latest generation LG Inverter air conditioners.

Fitted Kitchens

Kitchens furnished and equipped with household appliances:

  • oven,
  • microwave,
  • hood,
  • dishwasher,
  • fridge.
Terrace Gym

Gym offering the following equipment:

  • cardio,
  • weight training,
  • yoga,
  • boxing, and cycling.
Generator

330 kVA generator to support all building appliances in the event of a power outage

Water tank

70,000-liter tank with booster pump.

Elevator and Freight Lift

Kone elevator and freight lift, with maintenance contract.

Parking on the ground floor and in the basement

80 underground parking spaces and 35 spaces on the ground floor

Swimming pool

Panoramic swimming pool on the top floor

On-site property manager

A property manager is available within the residence for greater responsiveness

Concierge

Concierge service available from 8 a.m. to 8 p.m.

Continuous cleaning service

Morning and evening cleaning of the residence’s common areas.

Security
  • 24/7 Guarding
  • 24/7 Video Surveillance
Fiber optic

High-speed internet available.

Sky lounge and hanging garden
Air-conditioned bedrooms and living rooms

The bedrooms and living rooms are equipped with the latest generation LG Inverter air conditioners.

Fitted Kitchens

Kitchens furnished and equipped with household appliances:

  • oven,
  • microwave,
  • hood,
  • dishwasher,
  • fridge.
Terrace Gym

Gym offering the following equipment:

  • cardio,
  • weight training,
  • yoga,
  • boxing, and cycling.
Generator

330 kVA generator to support all building appliances in the event of a power outage

Water tank

70,000-liter tank with booster pump.

Elevator and Freight Lift

Kone elevator and freight lift, with maintenance contract.

Parking on the ground floor and in the basement

80 underground parking spaces and 35 spaces on the ground floor

Swimming pool

Panoramic swimming pool on the top floor

On-site property manager

A property manager is available within the residence for greater responsiveness

Concierge

Concierge service available from 8 a.m. to 8 p.m.

Continuous cleaning service

Morning and evening cleaning of the residence’s common areas.

Security
  • 24/7 Guarding
  • 24/7 Video Surveillance
Fiber optic

High-speed internet available.

Sky lounge and hanging garden

BLUE Apartments

BLUE Apartments

Apartment F2A
74 m²

Apartment F2A
74 m²

Apartment F2B
74 m²

Apartment F2B
74 m²

Apartment F3
150 m²

Apartment F3
150 m²

Apartment F4
219 m²

Apartment F4
219 m²

Apartment F5
282 m²

Apartment F5
282 m²

DUPLEX
378 m²

DUPLEX
378 m²

  • Progress status
Overall progress
23%

BLUE Residence

2025
04/08/2025

July 2025

  • Electrical work begins on the ground floor and first floor
  • Installation of drain pipes and plumbing on the ground floor and first floor
  • Masonry work on the first, second, and third floors
  • Installation of refrigeration and air conditioning condenser lines on the first and second floors
  • Rendering work begins on the first and second floors
06/07/2025

June 2025

  • Upper floor formwork on the 5th and 6th floors
  • Upper floor reinforcement on the 5th and 6th floors
  • Upper floor pouring on the 5th and 6th floors
03/06/2025

May 2025

  • Upper floor formwork on the 3rd and 4th floors
  • Upper floor reinforcement on the 3rd and 4th floors
  • Upper floor pouring on the 3rd and 4th floors
05/05/2025

April 2025

  • Formwork for the upper floor of the first floor
  • Reinforcement for the upper floor of the first floor
  • Casting of the upper floor of the first floor
04/04/2025

March 2025

  • Ground floor beam reinforcement
  • Ground floor upper floor formwork
  • Ground floor upper floor reinforcement
  • Ground floor upper floor pouring
03/03/2025

February 2025

  • Formwork for the upper basement floor
  • Reinforcement for the upper basement floor
  • Pouring of the upper basement floor
  • Reinforcement for the ground floor column
02/02/2025

January 2025

  • Pouring the foundation slab
  • Pouring the basement columns
  • Formwork for the upper basement floor
02/01/2025

December 2024

  • Start of reinforcement of the foundation slab
  • Formwork and pouring of the elevator pit
2024
02/12/2024

November 2024

  • Continuation and completion of permanent formwork masonry
  • Formwork and pouring of intermediate column
11/10/2024

October 2024

  • Excavation of the excavation base
  • Installation of polythene film for pouring of the concrete filling
  • Pouring of the concrete filling
  • Masonry and permanent formwork
For more information, please contact us by email at the following address: epsilon@epsilon.sn
[wppb progress=10 option= »candystripe orange » location=inside text= »Progression globale : 10% »]

Résidence BLUE

Sorry,You have not added any story yet

https://epsilon.sn/inc/uploads/2023/01/logo-epsilon-v3_footer-303x106-1.png
Lot 9, zone 14, Résidence Palmas, 1er étage
epsilon@epsilon.sn

Réalisé par Jaxaay Group

https://epsilon.sn/inc/uploads/2023/01/logo-epsilon-v3_footer-303x106-1.png
Lot 9, zone 14, Résidence Palmas, 1er étage
epsilon@epsilon.sn

Suivez-nous sur :

Réalisé par Jaxaay Group