Located in the heart of Almadies, Résidence Palmas offers you an idyllic living environment, where the vibrant main artery, with all amenities at a stone’s throw, meets the charm of a discreet and shaded alley.

→ 29 apartments
→ 4,200 m²  of living space
→ 45 parking spaces in the basement and the ground floor
→ 4 visitor’s parking spaces in front of the residence
→ Expected delivery date : 2024

Palmas Residence

Relevance, Assurance, Elegance

Located in the heart of Almadies, Résidence Palmas offers you an idyllic living environment, where the vibrant main artery, with all amenities at a stone’s throw, meets the charm of a discreet and shaded alley.

→ 29 apartments
→ 4,200 m²  of living space
→ 45 parking spaces in the basement and the ground floor
→ 4 visitor’s parking spaces in front of the residence
→ Expected delivery date : 2024

https://epsilon.sn/inc/uploads/2022/11/BROCHURE-PALMAS-4_NOVEMBRE_Page_07.jpg

Palmas Benefits

Palmas Benefits

Air-Conditioned Bedrooms And Living Rooms

The bedrooms and living rooms are equipped with the latest generation LG Inverter air conditioners.

Fitted Kitchens

Kitchens furnished and equipped with household appliances:

oven,
microwave,
hood,
dishwasher,
fridge.

Gym

Cardio equipment,
Bodybuilding,
Yoga,
Boxing and Cycling.

Generator

A 330 kVA generator to support all devices in the building in the event of a breakdown.

Water Tank

70,000-liter water tank, with booster.

Elevators

2 Kone-brand elevators, with maintenance contract.

Car Parks

45 parking spaces available in the basement and on the ground floor, and 4 visitor’s parking spaces in front of the residence.

Swimming Pool

15-meter-long swimming pool on the ground floor.

Building Manager On Site

Presence of a building manager inside the residence for more reactivity.

Video Surveillance

Surveillance cameras all around and inside the residence.

Concierge

Concierge services from 8 a.m. to 8 p.m.

Ongoing Cleaning Service

Morning and evening cleaning of the common areas of the residence.

Security Guards

Security teams are in place day and night, with electric fences all around the residence.

Optical Fiber

Broadband internet available.

Air-Conditioned Bedrooms And Living Rooms

The bedrooms and living rooms are equipped with the latest generation LG Inverter air conditioners.

Fitted Kitchens

Kitchens furnished and equipped with household appliances:

oven,
microwave,
hood,
dishwasher,
fridge.

Gym

Cardio equipment,
Bodybuilding,
Yoga,
Boxing and Cycling.

Generator

A 330 kVA generator to support all devices in the building in the event of a breakdown.

Water Tank

70,000-liter water tank, with booster.

Elevators

2 Kone-brand elevators, with maintenance contract.

Car Parks

45 parking spaces available in the basement and on the ground floor, and 4 visitor’s parking spaces in front of the residence.

Swimming Pool

15-meter-long swimming pool on the ground floor.

Building Manager On Site

Presence of a building manager inside the residence for more reactivity.

Video Surveillance

Surveillance cameras all around and inside the residence.

Concierge

Concierge services from 8 a.m. to 8 p.m.

Ongoing Cleaning Service

Morning and evening cleaning of the common areas of the residence.

Security Guards

Security teams are in place day and night, with electric fences all around the residence.

Optical fiber

Broadband internet available.

Palmas Apartments

Palmas Apartments

F2 Apartment
66 m²

F2 Apartment
66 m²

F3 Front Apartment
128 m²

F3 Front Apartment
128 m²

F3 Pool Apartment
133 m²

F3 Pool Apartment
133 m²

F5 Apartment
254 m²

F5 Apartment
254 m²

Penthouse
453 m²

Penthouse
453 m²

  • Etat d’avancement
  • Plan de l'Immeuble
Overall progress
72%

Palmas Residence

2024
08/04/2024

March 2024

– Suite with tiled floor and wall facade, floor 9 (Penthouse)
– Suite second layer coating wall and ceiling floor 7
– Continued technical electrical and plumbing work and kitchen installation
– Following tiling, jointing, cleaning and dismantling of facade scaffolding

04/03/2024

February 2024

  • Suite second coat paint coating floor 9 (Penthouse)
  • Ceiling closure suite floor 7
  • Continuation of coating finishing work and preparation of swimming pool and poolhouse support
  • Main facade tiling suite
31/01/2024

January 2024

  • Start of work on tiling screed and painting printing on floor 9 (Penthouse)
  • Ceiling closure suite floor 8
  • Following finishing work, tiling, electricity and plumbing, floor 3/4/5
  • Suite kitchen installation and finishing and aluminum frame floor 2 (control)
2023
31/12/2023

December 2023

  • Finished coated suite floor 9
  • Suite installation of hangers and false ceiling angles floor 6
  • Following finishing work on tiling, electricity and plumbing, floor 2 (witness)
  • Start of main facade coating
05/12/2023

November 2023

  • Coated masonry suite floor 9
  • Following installation of glass wool false ceilings (sound insulation) floor 5
  • Start of tiling work on floor 2 (witness)
  • Rear facade coating suite
01/09/2023

August 2023

  • Following elevations of posts and walls, floor height 8 (current floor)
  • Continued reinforcement and pouring of upper floor on floor 8 (current floor)
  • Post and sail elevations, floor 9 height (penthouse)
  • Reinforcement and pouring of upper floor 9 (penthouse)
02/08/2023

July 2023

  • Continuation of post elevations and walls height floor 7 (current floor)
  • Continuation of reinforcement and pouring floor upper floor 7 (current floor)
  • Post and wall elevations floor height 8 (current floor)
  • Reinforcement and pouring floor upper floor 8 (current floor)
03/07/2023

June 2023

  • Continuation and end of casting upper floor floor 5 (current floor)
  • Continuation and end of post and wall elevations floor height 6
  • Formwork, reinforcement and pouring upper floor floor 6 (current floor)
  • Beginning of post elevations, floor height walls 7
  • Continuation of road works and various networks on the main facade street
02/06/2023

May 2023

  • Continuation and end of casting upper floor floor 2 (current floor)
  • Continuation and end of post and wall elevations floor height 3
  • Formwork, reinforcement and casting upper floor 3
  • Beginning of post elevations, height walls and upper floor casting 4
02/05/2023

April 2023

  • Suite elevations posts and walls height floor 1 (mezzanine)
  • Formwork, reinforcement and casting upper floor 1 (mezzanine)
  • Column and wall elevations floor 2 height (current floor)
  • Reinforcement formwork and upper floor casting 2 (current floor)
03/04/2023

March 2023

  • Finalization of formwork, reinforcement of upper floor beams on the ground floor and swimming pool
  • Finalization of casting beams, high ground floor and swimming pool
  • Start elevation posts height floor 1 (1st floor)
  • Starting high floor formwork floor 1 (1st floor)
02/03/2023

February 2023

  • Following formwork, reinforcement and pouring floor high basement
  • Formwork, reinforcement and casting of posts and ground floor height walls
  • Formwork, reinforcement beams upper floor ground floor
  • Ground floor high formwork
06/02/2023

January 2023

  • Formwork, reinforcement and pouring of peripheral sails and elevators
  • Formwork and reinforcement upper floor basement
  • Formwork and reinforcement beams upper floor basement
  • Crane reception and assembly
02/01/2023

December 2022

  • Additional reinforcement of the base slab
  • Reinforcement installation and acceptance by the control office
  • Pouring of the base slab
  • Elevation of columns and walls to basement level
2022
02/12/2022

November 2022

  • Setting out of the lines
  • Building layout
  • Cutting of the base slab reinforcement
  • Installation of the base slab reinforcement
03/11/2022

October 2022

  • Demolition permit granted
  • Demolition of the villa that was on the site
  • Excavation and digging (up to 3.70m deep)
  • Laying of the blinding concrete
  • Concrete reinforcement and pouring of the elevator pit
Pour plus d’information, contactez-nous par e-mail à l’adresse suivante: epsilon@epsilon.sn
[wppb progress=10 option=”candystripe orange” location=inside text=”Progression globale : 10%”]

Résidence Palmas

Juin 2023

  • Suite et fin coulage plancher haut étage 5 (étage courant)
  • Suite et fin élévations poteaux et voiles hauteur étage 6
  • Coffrage, ferraillage et coulage plancher haut étage 6 (étage courant)
  • Début élévations poteaux, voiles hauteur étage 7
  • Suite travaux voirie et réseaux divers rue façade principale

Réalisé par Jaxaay Group

https://epsilon.sn/inc/uploads/2023/01/logo-epsilon-v3_footer-303x106-1.png
Résidence Jasmin, Almadies zone 6, 1er étage 1D
epsilon@epsilon.sn

Suivez-nous sur :

Réalisé par Jaxaay Group